Standing crop taller than a person before harvestingFields · 2026
Harvesting: reaper beside the tall standing cropHarvesting · 2026
Industrial hemp field at the height of the seasonFields · 2026
Standing crop before harvestingFields
Harvesting machine operatorTeam
Field under Valley center-pivot irrigationFields
Valley center-pivot irrigation machine over the cropFields · 2026
Crop height: about 3 mFields · 2026
Harvesting: mowing the stalk into windrowsHarvesting
Reaper at work during the harvestHarvesting · 2025
Windrows of mown stalkHarvesting
Harvesting at the foot of the mountainsHarvesting
Crop rows following the circle of the Valley center-pivot irrigation systemFields · 2026
Agronomist in the field after sowingTeam
Industrial hemp field in JuneFields · 2025
Seedlings in irrigation furrowsFields · 2026
Processing shop: decortication lineProcessing
Processing lines and the dust extraction systemProcessing
Stalks ready to be fed into the lineProcessing
Inclined conveyor of the lineProcessing
Section of the decortication lineProcessing
Retting: workers on the cassettes in the poolProcessing
Retting: stalk cassettes in the poolProcessing
Loading cassettes into the retting poolProcessing
Decortication line No. 1Processing · 2026
Breaking rollers of the decortication lineProcessing · 2026
Operator on the processing lineProcessing · 2026
Conveyor carrying fiberProcessing · 2026
Line control panelProcessing · 2026
Installation of processing lines, December 2025Processing · 2025
Sunrise greenhouse — 20,416 m²Greenhouse · 2025
29 spans of 8 m each, gutter height 4.3 mGreenhouse · 2025
Hot-dip galvanized steel frame and curtainsGreenhouse · 2025
Netafim fertigation unitGreenhouse · 2025
Dosing and control cabinetGreenhouse · 2025
Ventilation and climate controlGreenhouse · 2025
Production building on siteInfrastructure
Warehouse: stalk bales under coverInfrastructure
Walkway along the greenhouse to the production buildingGreenhouse
Packaged transformer substationInfrastructure
Security of the cluster siteInfrastructure
Pool with a waterproofing membraneInfrastructure · 2025
Valley center-pivot irrigation system — one of fourInfrastructure · 2026
Entrance to the fenced cluster siteInfrastructure
1,000 kW transformer substationInfrastructure
1,000 kW transformer and power lineInfrastructure
Road to the siteInfrastructure · 2026
Road between the greenhouse and the workshopInfrastructure
Avenue to the production buildingInfrastructure
Pool excavationConstruction · 2023, archive
Laying the waterproofing membraneConstruction · 2023, archive
Pouring concrete foundationsConstruction progress
New workshop before equipment installationConstruction · 2025
Production buildingConstruction · 2025
Fiber bales in the warehouseProducts · 2026
Fiber sample after decorticationProducts · 2026
Cottonin — spinning-grade fiberProducts
Hurd in bagsProducts · 2026
Molded pallets made from hurdProducts
Bales of retted stalk in the warehouseProducts · 2026
Bast fiber — a sample from the lineProducts
Visits by delegations and partnersEvents
Memorandum on long-term cooperationEvents · 2026